Hi, I just worked through the Linear Power Supply course and had a couple of questions;
When the +Vin was being routed on the top layer, what affected the decision to split the path into two instead of making one combined branch?
(eg, https://s23.postimg.org/4hjge62bv/image.png , where left side was in the video and right side is a possible path)
Also, is there a vague general consensus on "teardropping" for track to pad and track to track connections?
(such as in http://techdocs.altium.com/display/A...ardrop+Control)
When the +Vin was being routed on the top layer, what affected the decision to split the path into two instead of making one combined branch?
(eg, https://s23.postimg.org/4hjge62bv/image.png , where left side was in the video and right side is a possible path)
Also, is there a vague general consensus on "teardropping" for track to pad and track to track connections?
(such as in http://techdocs.altium.com/display/A...ardrop+Control)